Is there an alternative to Net Metering?

For members who install renewable generation, but aren’t a good fit with our Net Metering policy, an alternate parallel generation rider can be chosen. This pays members for their power generated at a rate of 150% of the cooperative's monthly system average cost of energy. No energy is banked, and there is no monthly sweep.